A Paradox in Individual Versus National Mental Health Vulnerability : Are Higher Resource Levels Associated With Higher Disorder Prevalence?

An earlier study (Dückers, Alisic, & Brewin, 2016) found that countries with greater social and economic resources were characterized by a higher lifetime prevalence of posttraumatic stress disorder (PTSD). Here, we present a similar analysis of national population survey data to examine this vulnerability paradox in relation to other disorders. We predicted the lifetime prevalence of any mental health disorder (i.e., anxiety, mood, substance, and externalizing disorders) in 17 countries based on trauma exposure and country vulnerability data. A substantial proportion of variance in all disorder categories, 32.9% to 53.9%, could be explained by trauma exposure. Explained variance increased by 5 and up to 40 percentage points after adding the variable of vulnerability to the equation. Higher exposure and lower vulnerability levels were accompanied by a higher prevalence in any mental disorder, with the largest effect size in mood disorders (R2 = .76). The interaction between exposure and vulnerability did not explain significant additional variance as it did for PTSD. Because a PTSD diagnosis links psychological, physical, and functional symptoms explicitly to trauma exposure, this might mean that populations in less-vulnerable countries are more likely to attribute health complaints to exposure. The results of this study suggest that country-level data can help to better explain the multilayered mechanisms of resilience and vulnerability in the context of trauma.



Geachte bezoeker,

De informatie die u nu opvraagt, kan door psychotraumanet niet aan u worden getoond. Dit kan verschillende redenen hebben, waarvan (bescherming van het) auteursrecht de meeste voorkomende is. Wanneer het mogelijk is om u door te verwijzen naar de bron van deze informatie, dan ziet u hier onder een link naar die plek.

Als er geen link staat, kunt u contact opnemen met de bibliotheek, die u verder op weg kan helpen.

Met vriendelijke groet,
Het psychotraumanet-team.


Reference: 
Michel L. A. Dückers, Chris R. Brewin | 2016
In: Journal of Traumatic Stress, ISSN 0894-9867 | 29 | 6 | december | 572–576
http://doi.org/10.1002/jts.22144
BRIEF REPORT
Affiliation author(s):